The utility hopes to build a new substation and add 3.3 miles of 230-kilovolt lines in the area, which would be one portion of the high-voltage lines running from Redmond to Renton.
This story is from The Seattle Times. Read the rest of this News story at https://www.seattletimes.com/seattle-news/eastside/pse-clears-key-hurdle-in-project-to-build-16-mile-power-line-on-the-eastside/?utm_source=RSS&utm_medium=Referral&utm_campaign=RSS_seattle-news.